TRDB Fitout Cost Estimator

📍 Refine Your Location 🔒 PRO
DIFC
💎 Unlock with Pro
ICD Brookfield Place
💎 Unlock with Pro

🎯 Go Pro to unlock zone-specific pricing, authority fee breakdowns, and building-level cost data.

✨ Fit-Out Quality
🏗️ Fit-Out (Base)
  • Partitions, doors & walls
  • Ceilings & lighting
  • Flooring & finishes
  • Reception & pantry joinery
  • Contractor preliminaries
⚡ MEP (Base)
  • HVAC distribution
  • Electrical & power
  • Lighting controls
  • Plumbing
  • BMS integration
  • CAT5/6 LV cabling to desks
  • WiFi infrastructure
  • Basic server room/rack
🎯 Options
Based on industry benchmarks from recent data
Fit-Out (Base)
MEP (Base)

Cost Breakdown Analysis

Professional estimate based on current market rates

📖 Glossary
MEP: Mechanical, Electrical & Plumbing
HVAC: Heating, Ventilation & Air Conditioning
BMS: Building Management System
IAQ: Indoor Air Quality
LV: Low-Voltage (data/voice/IT/AV cabling & containment)
FFE: Furniture, Fixtures & Equipment
LEED: Leadership in Energy and Environmental Design
📅 Book Consultation